ChatGPT Dots,直接派上用场
一份职责包,把一项长期工作交给你那个常驻的 ChatGPT dot。
Bot Generator Dot
Your dot spots repeat work in Gmail and Slack and drafts the next automation.
之前: Last 14 days: 5 "Welcome to Orbit: your first week" emails to new clients, same 6 steps, each edited by hand. "Where's the brand kit?" answered 4 times in #ops. The weekly client health post written by hand twice.
之后: Build Onboarding Writer next: a skill that drafts the first-week email for each new client, 30 min/week saved (estimate), drafts only. Client Health Reporter is second (Priority 18). The brand kit question needs a pinned link, not an agent: skipped. Evidence: 5 emails in Sent, Sep 21 to Oct 1. Decision: build | skip | later
Content Factory Dot
Your dot keeps your Notion content calendar full and packs every interview you share.
之前: Thursday 1:00 PM check-in. New in Google Drive "Content sources": a 48-minute podcast transcript with Lena Zhou as the guest. No release date in the file.
之后: "Every scope fight I've seen started with a file the client couldn't find." (31:12) Strongest line of the new pack 2026-W43-scope-creep: 8 drafts in your Notion Content calendar, Ready for review. The 15% margin claim waits for your [confirm]. Decision for you: hold the pack until the episode airs, so every post can link it? Recommendation: yes.
Design Studio Dot
Your dot checks every launch asset against your brand kit before it ships.
之前: New in Google Drive, Launches/Lumen 2.0: lumen-2-og.png. Priya in #launch-lumen-2: "OG image is final! Can someone resize it for X and LinkedIn?"
之后: Fix then ship (3 Off-brand, 2 Drift). The headline is Playfair Display 700, not Instrument Serif; white text over bright sky is about 1.9:1 [check]; "Used by 12,000 photographers" has no source [confirm]. Resizing is on hold. DECISION: reply in Priya's thread with the fixes? Draft ready. Needed by 12:00 PM America/Los_Angeles.
Engineering Outer Loop Dot
Your ChatGPT dot keeps PRs, CI and Linear tidy and brings you only the decisions.
之前: Slack DM from Sam (support), 2:12 PM: "Lumen says CSV exports from the Orders page are missing the last row. Every time, any date range. Ticket #8812, I filed WEB-512."
之后: Reproduced: Yes. A test exporting 3 orders produced 2 data rows. Suspected cause: src/orders/export/toCsv.ts:41 loops with i < rows.length - 1, left over from #803. Status: Branch fix/WEB-512-csv-last-row prepared with regression tests, not pushed. pnpm test src/orders/export: 18 passed. Decision needed: Push the branch and open a draft PR?
Life Assistant Dot
Your ChatGPT dot tracks renewals, returns and bills, and warns you before they close.
之前: You, Sat Oct 17, 10:12 AM: the dishwasher stopped draining, there's water sitting in the bottom. Can you find someone to fix it this week?
之后: Your Lumen warranty runs to Tue Dec 15, so start a warranty claim first: the repair may cost $0 [confirm drain faults are covered]. If Lumen can't come by Wed Oct 21, Northwind Appliance Repair has Mon Oct 19, 8:00 AM to 12:00 PM, with an $89 diagnostic credited to the repair. Acme Home Services can come today, 2:00 to 6:00 PM, for $129. Booking and paying are yours: pick one and I'll give you the booking page.
Meeting War Room Dot
Your dot preps your meetings, keeps the decision log in Notion and chases late owners.
之前: Thu Oct 15, 8:00 AM. Acme quarterly review (client, 60 min) and Hiring sync are both at 10:00 AM, both accepted. Elena asked last night for your call on keeping CSV import for Acme by Friday.
之后: 4 meetings, first at 10:00 AM. Highest stakes: Acme quarterly review. Needs you - Conflict at 10:00 AM: Acme quarterly review (client, 60 min) overlaps Hiring sync (30 min, Marco). Recommendation: keep Acme, move Hiring sync next to your 3:00 PM 1:1 with Marco. Your call: I do not move meetings. - Decision waiting: Elena asked for your call on keeping CSV import for Acme by Fri Oct 16. It is Q1 from the Onboarding v2 launch sync, still open.
SEO/GEO Dot
Your dot finds the pages losing clicks each week and drafts the refresh plan.
之前: Monday check-in. Search Console, last 28 days vs previous 28: no-show guide 1,180 to 640 clicks, deposits guide 530 to 352, marketing ideas post 2,040 to 1,610.
之后: 3 pages are losing clicks, for 3 different reasons. No-show guide (-46%): rankings fell from 5.9 to 9.4, refresh plan drafted. Deposits guide (-34%): position held but CTR fell from 3.1% to 2.0% under a new AI Overview, new title and opening drafted. Marketing ideas post (-21%): fewer people are searching, position and CTR held, so no rewrite. Your call: approve the no-show plan first?
Sales Follow-up Dot
Your ChatGPT dot drafts the follow-up and CRM note after every sales meeting.
之前: You call your dot from the car at 11:40: "Lumen. Six clinics, two more in spring. New-patient no-shows are 18 percent, she wants under 10. Spreadsheet and phone tree. Needs a BAA. Next is a demo for her clinic managers. I said I'd send a case study."
之后: Subject: Lumen: cutting no-shows below 10% Hi Ava, Thanks for the detail on the six clinics, especially the 18% no-show rate on new-patient visits and your goal of getting it under 10% before the two spring openings. What I heard: - Any vendor has to sign a BAA [confirm we sign BAAs] The case study is attached. Would Tue Oct 13 at 10:00 AM CT or Wed Oct 14 at 2:00 PM CT work for a 30-minute demo with your clinic managers? Jordan
dot 是 ChatGPT 的常驻智能体:它在对话之间持续工作,使用你连接的应用,带着结果或需要你拍板的事回来找你。GetKits 的 Dot 给你的 dot 交代一份长期职责,配置都已写好。
每个 Dot 都写明要连接哪些应用、给什么权限,要粘贴的职责说明和工作指令,哪些事需要你批准的自定义规则,以及定期汇报的时间表。
- GetKits 的 Dot 是什么?
- 它是给你的 ChatGPT dot 的一份职责包。粘贴一次,你的 dot 就会长期负责这件事,比如推进你的销售线索、盯紧会议待办,直到你修改或叫停。
- Dot 怎么安装?
- 下载安装文件。按说明连接应用,把职责说明和工作指令粘贴到 dot 的对话里,在 Settings > Personalization > Permissions > Custom rules 添加自定义规则,最后粘贴汇报时间表。
- 需要付费版 ChatGPT 吗?
- 需要。dot 目前面向 ChatGPT Pro 和 Business Premium 开放,Enterprise 需要管理员开启。它仍在按方案和地区逐步推出,请以 OpenAI 的最新说明为准。